Brand new Construction home down the street from Rowan University. Brand new kitchen with open concept, and Luxury Vinyl flooring. Those attending Rowan are encouraged to apply. Each student will be required to have a cosigner. Construction to be complete by June 1, 2024.
NJGL2039896
Single Family, Single Family-Detached, Split Level, 2 Story
6
GLASSBORO BORO
GLOUCESTER
3 Full
2024
0.21
Acres
|N Sq. Ft.
Public Water Service
Aluminum Siding
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...